Primavera Project Delay Analysis Course

Primavera Delay Analysis and Claim Management | Akim Engineering

Figure 1: Primavera Project Delay Analysis

This course provides training for Claim Management theory with case study examples on project management software. Participants will gain a knowledge through the basic concepts of claim management and delay analysis. This two-day class leads you through examples of specific claim analyzing tools, techniques and provides a lab-style workshop and allow students to apply the learned techniques in scenario projects.

Professional Development Units: Earns 13 PDUs

Learn To

Oracle Primavera P6 Delay Analysis Claim Management Training | Akim Engineering

Figure 2: Primavera P6 Baseline Delay Analysis

  • Claim Management and Delay Analysis Theory
  • Window Analysis, Planned vs. As Built, and Delay Analysis Tools and Techniques
  • Collapsed As Built Analysis (But For Schedules)
  • Time impacted Schedules, Extension of Time, Cost Adjustment

 

Delay Analysis Course Objectives

Primavera Claim Management | Akim Engineering

Figure 3: Primavera P6 Update Progress

  1. Learn the fundamentals of claim management idea in a project schedule, use tools and techniques
  2. Understand Delay Analysis, use claim management skills to improve your project management maturity

Audience

  • Claim Analyst
  • Project Manager
  • Contract Manager
  • Business Analysts
  • Planners and Schedulers

Suggested Prerequisites

  • Knowledge of project management principles
  • Knowledge of Windows
  • Primavera P6 Fundamentals

Claim Management and Delay Analysis Course Topics

  1. CPM Theory and different approach on Critical Path Method.
  2. Early and Late cash flow histograms and “S” curves convergency
  3. Constraints and effects on critical path and project activity dates
  4. Creating Baseline schedules, monitoring changes, revisions and updates
  5. Change orders, variation orders and revised baseline
  6. Alternate baselines, track project changes, and schedule comparisons
  7. Reporting planned versus earned progress and analyzing the delays
  8. Time impacted schedules, force major events to contract
  9. Introduction to the methodologies of “window analysis” and “as built vs as planned” techniques
  10. Collapses as built analysis (but-for) for owners and contractors perpective.
  11. Project performance metrics and earned value analysis on project delays
  12. Total float and free float discussion and ownership of float issue.
  13. Finish Variance and Float effect on delay analysis. Multiple Float Paths, secondary, tertiary critical paths
  14. Time impacts on path to interim deliverables such as milestones
  15. Alternate critical path theory, longest path vs TF = 0 differences on delay analysis
  16. Delay analyze case studies for penalty/incentive fees. Scenarios & workshops for delay event simulation
  17. Level of Effort Activities examples on cost adjustment and time extension
  18. Suspension and resumes on projects, effects of claim submissions

Key Features of Project Delay Analysis with Primavera Training

Baseline

Critical Path Method

Total Float

Free Float

Ownership of Float

CPM

Window Analysis

Estimation Of Time EOT

Time Impacted Schedules

Time Extension

Cost Adjustment

Liquidated Damages

Project Scope

Change Order

Collapsed As Built

But For Schedule

Finish Varince

Variation Order

Recovery Schedule

Recommended Related Training Courses: Project Management in Oracle Primavera P6 Basic and Advanced

Learn more about Delay Analysis Training and Send Message

We Deliver Oracle Primavera Trainings in many Different Formats

Primvera Online Training Akim Engineering Live Instructor-Led Online Trainings

Online training will be delivered through internet by using Zoom, Webex, Teams, etc.. Instructor will be online during training time and broadcasting Primavera course. All attendants will watch lectures and follow the presentations from instructor screen live while participating in their own computer, so they will have a chance to practice as well. Training is performed in interactive way, so trainees can ask questions and get answer anytime.

Primvera Course - Oracle Expert Akim Engineering On Demand Training at Customer Office

Customer may choose to invite instructor to their own office. Onsite Primavera trainings may be performed anytime and anywhere depending on client needs.On demand training can also be customized according to prefrences of the client. We are travelling to all around the world including construction sites to provide primavera courses. It is charged by group.

Project Planner Primavera Training- Akim EngineeringOpen Trainings are available in Public Classroom for Everyone

Public trainings are delivered every month periodically in different cities. In class Primavera trainings are open for everyone who wants to attend. Please contact us and learn upcoming primavera course schedule date, time and locations. It is chagarged by person. Limited seats are available and maximum 12 people allowed in a classroom.

Oracle Primavera Courses are delivered either Online, Onsite or in Classroom depending on customer choice

Online Instructor-Led (live) Oracle Primavera Training

Online instructor-led live Primavera trainings are performed through Zoom, Webex, Microsoft Teams or such platforms by sharing trainers screen and voice simultaneously. Trainees are not required to have Primavera P6 license. Before the Primavera online training day, Primavera P6 and sample projects are installed on all attendants’ computers for educational purpose temporarily. Everyone simultaneously watches and listens to live instructor screen and voice while practicing their own computer. Computer speaker and microphone is required, webcam is not necessary. Primavera Trainer will be online like everyone attending the Primavera online class, so training is delivered in interactive ways. There will be both verbal and written communication between Primavera lecturer and students during training. Everybody in the online Primavera class can ask questions and get answers immediately.

Online trainings are performed every month for all levels. Planned Online Primavera training calendar for following months is announced earlier and registrants are signed up to join. Total course hours may vary depending on training types. Online trainings are delivered on either daytime or nights. Attendants can choose any date and time which is more convenient for them. For instance, training at nighttime may be more suitable for people who works during day.

Online Primavera training is best for companies and individuals who wish to get Primavera training at their comfortable environment like home or office with ease. Especially online night-time classes which starts after work time is extremely popular. No travel required. No social distance violations in pandemic conditions at all. All you need is an internet connection and computer. It is not required but recommended to have a second screen like additional monitor, tv, or even tablets help students to follow trainer and work on Primavera in their computer at the same time. Standard Primavera course curriculum are applied. Electronic documents, case studies, sample projects are given to all trainees. Professional development units (PDU) and successfully completion certifications by Primavera Specialized Oracle Expert is provided.

Onsite Oracle Primavera Training

On site trainings are designed for companies who wish to receive training in their office as a specific group. On-site trainings are also planned on demand, so you can contact any time and request Primavera training at your location. Training content may also be modified according to your needs and preferences. Primavera trainings are tailored to meet exactly your expectations and teach the parts & functionalities that you are mostly focusing on. Primavera course subjects and topics may be defined together, and moreover all training contents can be customized for your priorities and offered the best service that help you to succeed on your project. You may add or remove any Primavera training subject to your course event. Training date and time are scheduled by client, and course calendar is aligned completely depending on customers availability and choices. Customer decides the number of attendants for Primavera on-site training. Maximum 15 people are recommended unless any exceptions or special cases are informed. Client provides the meeting room and provides other required equipment as well. All attendants bring their laptops. Primavera license is not required. Primavera P6 installation for educational purpose is temporarily provided. Electronic documents, case studies, sample projects are given to all trainees. Professional development units (PDU) and successfully completion certifications by Primavera Specialized Oracle Expert is provided.

Onsite Primavera training is best for clients who wish to get Primavera training in their own office location or in their working site, on the specific date/time, with the course content which can be customized/modified to align needs, and as a specific group of people in same company that are chosen by manager or Primavera training organizer from human resources department.

In Classroom Oracle Primavera Training

In classroom trainings are held in predefined venues that are located in central location in various cities worldwide. The classroom equipped with student desks, whiteboard, projectors, and Primavera installed computers. Therefore, no need to carry and bring laptops. Anybody does not have to own a Primavera license or installed computer either. It is provided by AKIM Engineering. In classroom public trainings are open for anyone who wish to join and learn Primavera. Public class trainings are usually planned for every month and published through AKIM Engineering website and social media channels and announced accordingly. Primavera training classrooms have limited seat availability in order to provide learning efficiency. Maximum 12 people are allowed for each class. Both attendants from various companies and individuals sign up and register for the class at least one week earlier than scheduled open training date.

Primavera training in classroom is best for individual professionals who needs to learn project management and planning skills in Primavera for career/personal development and who wants to join the open public classroom trainings. All confirmed registrants are show up and get ready on the day and time of announced training. Coffee/tea and cookies are provided on the break times, and snacks, soft drinks are complimentary as well. Electronic documents, case studies, sample projects are given to all trainees. Standard Primavera course curriculum are applied. Professional development units (PDU) and successfully completion certifications by Primavera Specialized Oracle Expert is provided. Note: Due to pandemic conditions in worldwide, open classroom trainings are suspended temporarily for your health and safety. Primavera Classroom trainings turned into online live instructor led classes with the same content. Please contact us for more information and any special inquiries.